So my last brew day was in around Dec 2nd and was the DIPA and Milk Stout for the HRB comp. Been out of beer for a bit now. But told myself I'm not brewing til I can brew indoors...
So lets get to it....
Pre Demo.... What the room was like.... No kids were evicted. The toy graveyard has been relocated.
Demo was rewarding. Those shelves were a bastard!!! Then I pulled the trigger and went with a cost effective pre built solution along with a 450 CFM stainless vent. Sorry Dave ya didn't even stock what I needed

Hosehead 5BC controller
50amp spa panel
Dual Hotrod Heat Sticks The next part was construction. These obviously aren't in any particular order.
And this brings us to the current status.
Floor and door installed. Started trim. I'm hoping to get the rest of this done this week/weekend and be brew ready for the weekend of April 8th.